Сховані поля
Книги Книги
" The conductors must not be placed in position until all mechanical work on the building has been, as far as possible, completed. d. Must not be so placed as to be subject to mechanical injury by saws, chisels or nails. "
The National Electrical Code: An Analysis and Explanation of the ... - Сторінка 212
автори: Richard Henry Pierce - 1896 - 222 стор.
Повний перегляд - Докладніше про цю книгу

Electrical Engineer's Pocket-book: A Hand-book of Useful Data for ...

Horatio Alvah Foster - 1901 - 1018 стор.
...places. For conduit work : ??. "Must have an approved, rubber insulating covering (see "No. 47). o. Must not be drawn in until all mechanical work on...building has been, as far as possible, completed. p. Must, for alternating systems, have the two or more wires of a circuit dritwn in the same conduit....
Повний перегляд - Докладніше про цю книгу

Distributing system and lamps

Francis Bacon Crocker - 1901 - 514 стор.
...damp places. For conduit work : «. Must have an approved rubber insulating covering (see No. 47). n. Must not be drawn in until all mechanical work on...building has been, as far as possible, completed. p. Must, for alternating systems, have the two or more wires of a circuit drawn in the same conduit....
Повний перегляд - Докладніше про цю книгу

International Library of Technology: A Series of Textbooks for Persons ...

1902 - 742 стор.
...abrasion. f. Must have the metal of the conduit permanently and effectually grounded. Wires in Conduits — Must not be drawn in until all mechanical work on...the building has been as far as possible completed. Must for alternating-current systems have the two or more wires of a circuit drawn in the same conduit....
Повний перегляд - Докладніше про цю книгу

The Electrical Transmission of Energy: A Manual for the Design of Electrical ...

Arthur Vaughan Abbott - 1904 - 754 стор.
...placed in molding in concealed or damp places. For Conduit Work. n. Must have approved insulation. a. Must not be drawn in until all mechanical work on the building is completed. p. Must not have wires of different circuits drawn in the same conduit. q. Must, for...
Повний перегляд - Докладніше про цю книгу

Electric Light Wiring

Charles Edwin Knox - 1907 - 336 стор.
...Code.) Wires. For Conduit Work. n. Must have an approved rubber insulating covering. (See Xo. 47.) 0. Must not be drawn in until all mechanical work on...building has been, as far as possible, completed. Conductors in vertical conduit risers must be supported within the conduit system in accordance with...
Повний перегляд - Докладніше про цю книгу

Modern Electrical Construction: A Reliable, Practical Guide for the Beginner ...

Henry Charles Horstmann, Victor Hugo Tousley - 1908 - 352 стор.
...a firm hold. For Conduit Work. n. Must have an approved rubber insulating covering (see No. 47). 0. Must not be drawn in until all mechanical work on...building has been, as far as possible, completed. Conductors in vertical conduit risers must be supported within the conduit system in accordance with...
Повний перегляд - Докладніше про цю книгу

Compiled Ordinances of the City of St. Paul, Minnesota

Saint Paul (Minn.). - 1908 - 1260 стор.
...in concealed or damp places. n. Must have an approved rubber insulating covering. (See No. 47.) o. Must not be drawn in until all mechanical work on...building has been, as far as possible, completed. p. Must for alternating systems have two or more wires of a circuit drawn in the same conduit. 2065....
Повний перегляд - Докладніше про цю книгу

Ordinances Relating to Buildings, City of Seattle

1910 - 232 стор.
...conduit work must have a rubber insulation meeting the requirements specified for conductors in Sec. 32; must not be drawn in until all mechanical work on the building has been as far as practicable completed; and conductors in vertical conduit risers must be supported within the conduit...
Повний перегляд - Докладніше про цю книгу

Building, Plumbing, Gas and Electrical Laws of the City of Dallas, Texas ...

Dallas (Tex.). - 1914 - 266 стор.
...grounding clamps or other approved device to a suitable ground connection as provided in Section 25. (u) Must not be drawn in until all mechanical work on...building has been, as far as possible, completed. Conductors in vertical conduit rises must be supported within the conduit system in accordance with...
Повний перегляд - Докладніше про цю книгу

Digest of the City of Little Rock, Arkansas

Little Rock (Ark.). - 1915 - 770 стор.
...Sec. 656. SAME — FOB CONDUIT WORK. — Wires must have an approved rubber insulating covering, (b) Must not be drawn in until all mechanical work on...building has been, as far as possible, completed. Conductors in vertical conduit raisers must be supported within the conduit system in accordance with...
Повний перегляд - Докладніше про цю книгу




  1. Моя бібліотека
  2. Довідка
  3. Розширений пошук книг
  4. Завантажити ePub
  5. Завантажити файл PDF