... everything called for in 14. Safeguards and Débris . 15. Plans . 16. Tests ELECTRIC LIGHTING SPECIFICATIONS . 37 Work, Labor, and Materials Additional, Omitted, or Changed Work Replacement of Defective Material Patented Apparatus.
... everything called for in 14. Safeguards and Débris . 15. Plans . 16. Tests ELECTRIC LIGHTING SPECIFICATIONS . 37 Work, Labor, and Materials Additional, Omitted, or Changed Work Replacement of Defective Material Patented Apparatus.
Сторінка 38
... Tests . these specifications , but also any special . devices or methods peculiar to his system which will add to ... tests , especially the final tests , must be deter- mined for the most part by a consideration of each 38 ELECTRIC ...
... Tests . these specifications , but also any special . devices or methods peculiar to his system which will add to ... tests , especially the final tests , must be deter- mined for the most part by a consideration of each 38 ELECTRIC ...
Сторінка 39
... tested while in process of construction and any defects found shall be immediately remedied . The final tests shall be made in the presence of the engineer } architect or his representative , and the right is reserved by ( the purchaser ) ...
... tested while in process of construction and any defects found shall be immediately remedied . The final tests shall be made in the presence of the engineer } architect or his representative , and the right is reserved by ( the purchaser ) ...
Сторінка 40
... tests will also enter largely into the conditions of the acceptance . ) ( The purchaser ) will assume no liability nor responsibility for any part of the installation until formally accepted in writing . No part of the installation will ...
... tests will also enter largely into the conditions of the acceptance . ) ( The purchaser ) will assume no liability nor responsibility for any part of the installation until formally accepted in writing . No part of the installation will ...
Сторінка 41
... tests as specified . Such acceptance , however , shall not prejudice any claim which ( the pur- chaser ) may have for the replacement of de- fective material for the time specified . The date of the completion of the final tests shall ...
... tests as specified . Such acceptance , however , shall not prejudice any claim which ( the pur- chaser ) may have for the replacement of de- fective material for the time specified . The date of the completion of the final tests shall ...
Інші видання - Показати все
Загальні терміни та фрази
Age money Alternating Current ampère meter apparatus appliances arc lamps armature attached automatic baseframe bidder shall fill bids building c. p. lamps cables candle power capacity carried ceiling cent centre of distribution cleats conductors conduit connections contractor shall furnish cross-arms cuits cut-out boxes cut-outs and switches Direct Current double-pole dynamo or circuit dynamos Trade number erect the following fastened fill out completely fixture foundation(s full load fuses hand regulator incandescent lamps inches incombustible bases installation insulated wire insulation resistance junction boxes knife switch least lightning arresters main wires ments moisture moisture-proof molding necessary non-combustible number of lights number or designation ohms operation outlets pipes placed plant porcelain potential pressure proper protected pulleys purchaser Rating of exciters riser feeder schedule securely set screws shunt Sockets soldered spark arresters specification steam struction switchboard taps three-wire tightened tion tube two-wire voltage voltmeter volts walls waterproof wire smaller