Report of the Chief of Engineers U.S. Army, Частина 1U.S. Government Printing Office, 1894 Includes the Report of the Mississippi River Commission, 1881-19 . |
Зміст
3 | |
14 | |
20 | |
35 | |
50 | |
58 | |
65 | |
84 | |
352 | |
361 | |
366 | |
370 | |
379 | |
383 | |
388 | |
389 | |
108 | |
118 | |
132 | |
133 | |
145 | |
146 | |
153 | |
154 | |
162 | |
168 | |
174 | |
182 | |
184 | |
196 | |
200 | |
210 | |
219 | |
232 | |
234 | |
238 | |
250 | |
251 | |
261 | |
270 | |
277 | |
282 | |
289 | |
291 | |
299 | |
301 | |
302 | |
308 | |
315 | |
333 | |
397 | |
398 | |
402 | |
404 | |
409 | |
417 | |
418 | |
421 | |
424 | |
431 | |
434 | |
437 | |
441 | |
447 | |
461 | |
463 | |
468 | |
489 | |
499 | |
527 | |
532 | |
562 | |
568 | |
571 | |
604 | |
638 | |
719 | |
723 | |
741 | |
790 | |
804 | |
823 | |
Інші видання - Показати все
Загальні терміни та фрази
100 feet wide 12 feet deep 1896 Submitted 60 feet 9 feet act of August act of March Amount estimated amount expended Appendix appropriated by act August 17 available for fiscal balance unexpended June Bayou breakwater bridge canal Chief of Engineers commenced completion of existing compliance with requirements construction Corps of Engineers Creek cubic yards deep at mean dike dredging dredging a channel ending June 30 entrance estimated cost existing project expended during fiscal expended in fiscal expended to June feet at low feet depth feet long fiscal year ending harbor acts Island jetty July 13 Lake Ledge Lieut mean low tide mean low water miles mouth navigation obstructions overhanging trees piers present project profitably expended repairs required for completion requirements of sections riprap river and harbor rock Secretary of War September 19 shoals Submitted in compliance sundry civil act survey tons unexpended June 30 vessels wreck
Популярні уривки
Сторінка 728 - ... of the channel of any navigable water of the United States, unless the work has been recommended by the Chief of Engineers and authorized by the Secretary of War...
Сторінка 420 - An Act making appropriations for the construction, repair, and preservation of certain public works on rivers and harbors and for other purposes...
Сторінка 529 - A new project was therefore suggested, providing for the construction of two breakwaters, one on the north side and the other on the south side of the...
Сторінка 19 - AND HARBOR IMPROVEMENTS. The, funds with which the. -works for the improvement of rivers and harbors were prosecuted during the last fiscal year were derived from the appropriations by the river and harbor act approved...
Сторінка 727 - Provided, That contracts may be entered into by the Secretary of War for such materials and work as may be necessary to complete such project, to be paid for as appropriations may from time to time be made by law, not to exceed in the aggregate...
Сторінка 613 - Cod, and as therefore being a dangerous obstruction to navigation. Under the provisions of section 4 of the river and harbor act of June 14, 1880, and by direction of the Secretary of War of...
Сторінка 576 - The approved project of 1880, as modified in 1885, provides for the construction of two jetties as training walls, one on each side of the harbor entrance, planned so as to allow the tidal current to assist in scouring out and maintaining a good channel, and for the completion of the work by dredging where necessary to obtain a depth of from 12 to 15 feet at low water in this channel; all at a total cost estimated in 1885 at $375,000. of which $195,000 was appropriated prior to 1804.
Сторінка 810 - The present project was adopted in 1874, and provides for obtaining, by diking and dredging, and where necessary, by drilling and blasting rock, a channel 200 feet wide and 10 feet deep at mean low water, from the mouth to New Brunswick, at a cost of $2,093,062.05.
Сторінка 35 - The enlarged project provided for the construction of two breakwaters, one on the north, the other on the south side of the...
Сторінка 603 - Congress, second session, provides for the widening and deepening of the river so as to secure a channel of at least 12 feet depth at high water, with 100 feet width from its mouth up to Berkley Bridge (above Dighton) ; thence 12 feet depth with 80 feet width (100 feet width at bends) up to Briggs Shoal; thence 11 feet depth with 80 feet width up to the "shipyard...