Зображення сторінки
PDF
ePub
[blocks in formation]

Number.
Material.
Size.
Design.
i To be wired how.

See dynamo regulating instruments.
Lightning arresters.
Ground detectors.
Testing sets,

| Plug

Snap. Switch

Knife. boards?

Automatic.
Instru-

Single pole.

Breakdown.
Switches. Double "
ments.

Throwover.
Three wire.

Dynamo changing.
Circuit changing.
Short circuiting.
| Reversiug, etc.

Single pole. Fusible.
Cut-outs. Double Automatic.

Three wire. Magnetic.

Interior wiring?

Number of circuits.

Lamp.
Number of outlets. Switch.

Meter.
Number of lights.

Incandescent.

Arc. "Meu
Insulation.
Insulation resistance.

Under cleats.

In molding
Method of wiring. { On insulators.

Concealed.

'n conduits.
Variation in pressure.
Cut-outs.
Switches.
Cabinets, junction boxes, etc.

Number.
Meters.

Kind.

Capacity.
Converters.

Number.
Capacity.

[blocks in formation]

Incandescent.

Fixtures ?

Number.
Interior. Kind.

Finish.
[Hoods.

Reflectors.

Brackets.
Exterior, Cross-suspension fix-

tures.

Waterproof globes.
Hoods.

Plain.

Opal.
Globes. Ground.

Half-ground. cletas

Colored, etc.
Spark arresters.
Nets.
Hanger boards.
Circuit cut-outs.
Outriggers.
Pole tops.
Mast arms.
Posts.
Lowering devices.

of aresten!

Arc.

Number of circuits.
Number of street lamps.
Insulation.

Poles.
Pole line? į Cross arms.

Pins and insulators.
Steps.
Line lightning arresters.
Fall of potential.

[ocr errors]
[blocks in formation]
[blocks in formation]

Parties making bids for any portion of the 2. Warning. work contemplated under these specifications (and plans) must familiarize themselves there. with both as regards that portion of the work covered by their bid and such other work as must be carried on, or is intended to operate in conjunction therewith, in order that the true spirit and intent of these specifications (and plans) may be fulfilled. In case these specifications (and plans) are in any part deficient or not clearly expressed, the parties making bids shall apply to for the required information before such bids are submitted, as no changes will be allowed in specifications (or plans) after the contract is awarded except under the conditions named in article - Additional, Omitted or Changed Work.”

It must be understood and agreed that these specifications (and plans) shall be fulfilled in their true spirit and intent, and that any apparatus or appliances essential to the proper and convenient operation of the system shall be supplied and installed without extra charge even though not specifically called for.

[blocks in formation]
« НазадПродовжити »