Зображення сторінки
PDF

s Insulation.
s On insulators.

Wires to - | Under cleats.
switch- wo be { In molding.
boards? - | Concealed.
UIn conduit.
l Capacity.
Number.
Material.
Size.
Design.

To be wired how.
See dynamo regulating instruments.
Lightning arresters.
Ground detectors. -
Testing sets.

s s Plug.
Snap.
Knife.

Instru- | Single pole. Automatic.

- iA 4 Breakdown. ments. Switches. | *i. Throwover.

Switchboards?

[merged small][ocr errors]

Dynamo changing.

Number of circuits.
Lamp.
Number of outlets. J Switch.
Meter.

- Incandescent. Number of lights. | Arc.

Insulation. * ~1,
Insulation resistance. I
Under cleats.
In molding.
Interior Method of wiring. On insulators.
wiring? | Concealed.
| 'n conduits.
Variation in pressure.

Cut-outs. Switches. Cabinets, junction boxes, etc. | Number. Meters. Kind. | Capacity. Number. converters. | Capacity. s Number. | Key. | Keyless. l Porcelain. Sockets and | Base. | Wood, etc. receptacles 2 Plo C Finish. Polished. | Plated, etc. | Waterproof. Number.

[merged small][merged small][merged small][merged small][merged small][ocr errors]

s - Number. Interior. 2 Kind. Finish. s Hoods. Tncandescent. | Reflectors. | Brackets. Exterior. { Cross-suspension fixtures. V- | Waterproof globes. Hoods. Plain. Opal. f ! Fixtures 2 Globes. Ground. es zo too | Half-ground. Co. o. o. | Colored, etc. Spark arresters. Arc. { Nets. Hanger boards. Circuit cut-outs. Outriggers. Pole tops. Mast arms. Posts. | Lowering devices,

Number of circuits.
Number of street lamps.
Insulation.
Poles.
Pole line? | Cross arms.
Pins and insulators.
Steps.
Line lightning arresters.
Fall of potential.

[merged small][merged small][merged small][merged small][merged small][ocr errors]

$ v

SPECIFICATIONS FOR THE INSTALLATION

OF - - - ELECTRIC

LIGHTING PLANT AT - -

Parties making bids for any portion of the 2. Warning. work contemplated under these specifications (and plans) must familiarize themselves therewith both as regards that portion of the work covered by their bid and such other work as must be carried on, or is intended to operate in conjunction there with, in order that the true spirit and intent of these specifications (and plans) may be fulfilled. In case these Specifications (and plans) are in any part deficient or not clearly expressed, the parties making bids shall apply to for the reQuired information before such bids are submitted, as no changes will be allowed in specifications (or plans) after the contract is awarded except under the conditions named in article “Additional, Omitted or Changed Work.” It must be understood and agreed that these ~specifications (and plans) shall be fulfilled in their true spirit and intent, and that any apparatus or appliances essential to the proper and convenient operation of the system shall be supplied and installed without extra charge even though not specifically called for,

[ocr errors][ocr errors]
« НазадПродовжити »