Material.
Diameter.
Stack? -I Height.

Flues and dampers.
Pier or stack foundations.

Method.

Connection with heating system.

( Ordinary gate or globe.
Valves. -I Reducing.
Piping? \ ( Back pressure.

Atmospheric exhaust.
Exhaust heads.
Water supply, drips, blow off.
L Pipe covering.

( Number. Condensers? -I Kind.

(Capacity.

Pumps and injectors.
Heaters and purifiers.
Separators.
Oil extractors.

Date of commencement and completion

Date of starting plant.

Inspections.

Tests.

Terms of payment.

SPECIFICATION.

Parties making bids for any portion of the work contemplated under these specifications (and plans) must familiarize themselves therewith both as regards that portion of the work covered by their bid and such other work as must be carried on, or is intended to operate in conjunction therewith in order that the true spirit and intent of these specifications (and plans) maybe fulfilled. In case these specifications (and plans) are in any part deficient or not clearly expressed, the parties

making bids shall apply to for the

required information before such bids are submitted, as no changes will be allowed in specifications (or plans) after the contract is awarded except under the conditions named in article "Additional, Omitted or Changed Work."

It must be understood and agreed that these specifications (and plans) shall be fulfilled in their true spirit and intent and that any apparatus or appliance essential to the proper and convenient operation of the system shall be supplied and installed without extra charge even th ough not specifically called for.

PREAMBLE.

Parties bidding shall state specifically just what part of these specifications their bid covers.

A complete and correct copy of these specifications shall be attached to each bid submitted.

All bids must be submitted on or before

The right is reserved to reject any or all bids.

No bid will be considered unless accompanied by a certified check in the sum of

, payable to , said check to be

forfeited if the successful bidder shall

fail to deposit with within days

after the acceptance of his bid the bond required under these specifications. The checks of unsuccessful bidders will be

returned to them within days from

date of opening bids.

4. Bond. Successful bidders will be required to

furnish an approved bond within

days after the acceptance of their bid in

the sum of to faithfully commence,

carry on, and complete their work in every respect according to the true spirit and intent of these specifications.

5. contractor. The word "contractor" as herein

used refers to the party or parties whose bid or bids for the whole or any part of the work contemplated under these specifications have been accepted.

6. Commence- Contractors under these specifications

ment and

completion ghall commence work on dates to be assigned, notice to be given of such dates

not less than days in advance. All

work shall proceed as rapidly as is consistent with thoroughness and good workmanship, and shall be completed in the following times:

Installation of dynamos, storage batteries and apparatus within days after assigned date of commencement.

Installation of wiring and wiring devices

within days after assigned date of

commencement.

Erection of pole line and wire within days after assigned date of commencement.

Installation of fixtures and dependent

work within days after assigned date

of commencement.

Installation of steam plant complete

within days after assigned date of

commencement.

But delays due to strikes, riots, or accidents beyond the control of contractors shall be added to the time stipulated above for the completion of the work provided application is made in writing by the contractor at the time such delay occurs, giving its nature and extent, such application to be subject to the approval of .