STEAM PLANT.

tion for Steam Plant.

(Note.--This specification will be found 200. Specificaapplicable to many central station plants up to 200 h. p. or 300 h. p., and for isolated plants where the conditions imposed by municipal and insurance regulations, considerations of the utilization of exhaust steam, or of combining a heating and power plant, and questions of a similar nature do not require special attention.

The forms of Warning, Preamble, and General Specification are, with but slight changes, also adapted to this specification.)

This contractor shall furnish and erect, complete in all its details, the following steam plant:

[blocks in formation]
[blocks in formation]

202. Fittings.

minute, and must be designed in all

their parts to develop this power for

indefinite periods.

The variation in speed from no load to full load shall not exceed

per cent. All material and workmanship shall be of the highest grade; all parts accurately made to standard gauge; all moving parts carefully balanced; all valves and packing free from leakage.

They
It

shall operate noiselessly and

without vibration when set on (a) suitable fcundation(s) and properly piped.

[blocks in formation]

tion bolts and washers, sight feed cylinder lubricator, throttle valve, sight feed oil cups, full set of wrenches, governor pulley, driving pulley of proper dimensions for driving the dynamo selected (and all necessary pipes, valves, reducing motion and attachments for taking indicator cards.

Indicators to be furnished by the purchaser.)

are

(Note.-If the dynamo(s) }

to be

direct driven by the engine(s) there should be added to the above specification the type or types of dynamo(s) which may be selected from; the method of connecting engine(s) and dynamo(s); and any special fittings such as extension to engine foundation box, extended shaft, out board bearing, spot for supporting fields, attachment for securing brush-holder, etc.)

(As required.)

203. Painting.

204. Foundations.

The foundation(s) for the(se) engine(s)

shall be built by the purchaser } of

[ocr errors]

laid, and shall be of sufficient length, width and depth to safely and firmly sustain their weight and all strains to

which

they are
it is

subjected. All neces

sary excavating or filling and the removal of all debris shall be done by the contractor. The foundations shall be purchaser.

of such height that the driving pulley(s)

will swing { clear of the floor

(Note.-Foundations for direct-connected outfits should extend under both engine and dynamo.)

(Character of the soil should also be specified, and the method of isolating and insulating the foundation if required.)

Plant and Instruction.

(Note.-If this contractor furnishes 205. Starting plant complete, this section can be put

[blocks in formation]

will be furnished by (the purchaser).

This contractor shall also give all necessary instructions to the engineer of (the purchaser) for the proper

nance, and operation of the

care, mainte

engin
engine(s),

such instructions to be given during the

trial period stipulated above.

double leather, endless, solid )

[blocks in formation]

206 Belts.