Зображення сторінки
PDF
ePub

72. Globes.

( clear glass)
full ground
half ground }globes.
opal

( colored, etc.) 73. Spark Ar - wire-gauze spark arresters, and ---

" wire globe-nets.

rester's and

Nets.

77. Carbous.

- sets of carbons, a set consisting of one upper and one lower carbon.

75. Starting Plant and In

struction. 76. Renewal

Parts.

77. Summary.

(See p. 46, sec. 25.)
(See p. 47, sec. 26.)
(See Note: p. 47, sec. 27.)

Each bidder shall fill out completely the
following summary:
Number of dynamos
Trade number or designation
Rating in volts . . . . .
Rating in ampères . . . . .
Capacity in —— c. p. lamps . .
Series or shunt wound . .
H. P. required to be delivered at pulley

at full load with no loss in the line ---

SWITCHBOARD, APPARATUS, AND CONNECTIONS.

78. Switchboard Com

plete.

This contractor shall furnish and erect the following apparatus and material:

One combination (material) switchboard with a capacity for ------ circuits, and provided with the necessary sockets, plugs, main and

transfer cables, testing connections, and a suitable and convenient device for holding cables not in use. It shall be so arranged and marked that any circuit or series of circuits may be quickly connected with or disconnected from any dynamo with the least possible danger of short-circuits or error. Sockets shall be so designed that it is practically impossible to short-circuit, ground, or receive a shock from them. All connections with the dynamo leads shall be easily accessible. All wires used in making connections shall have -- insulation. All plugs shall have well insulated wooden handles, and the cables shall be covered with soft-rubber tubing or equivalent as an extra precaution. All cables shall be of stranded wire.

All joints shall be soldered. All connections to switches, cut-outs, etc., shall be soldered or made with an approved form of lug or setscrew, in all cases care being taken to secure good and sufficient contact to prevent heating and insure permanency; when made with lugs or set-screws they shall be in plain sight and easily accessible for tightening. Connecting wires shall be so run and secured that crosses or grounds are impossible in the normal operation of the plant.

FIXTURES, ETC. (Note.- No set specification can be made for 79. Fixtures fixtures and shades; their character must be

and Shades.

80. Lamps.

etc.,

etc.

determined wholly from individual requirements. See schedule, p. 107.).

This contractor shall furnish and deliver at -- the following number, sizes, and kinds of incandescent lamps: Number. C. p. Voltage. (Plain.

Ampèrage. Frosted. etc.

-- { Colored, etc.

etc. stating, also, their make and the make of the socket for which they are adapted.

Lamps shall be guaranteed to have an average life of not less than —- hours if burned at their normal voltage. They shall burn with a white light, and shall not blacken under proper use. All lamps giving out or proving defective during the trial period of -- days under normal and proper use shall be replaced without charge.

This contractor shall furnish and deliver at -- the following numbers and kinds of sockets and receptacles:

Number. Kind. Finish.

81. Sockets and Recep

tacles.

etc.

82. Meters.

etc.

etc. This contractor shall furnish and I deliver at 7 place in position f the following numbers

watt meter, and sizes of the — 3 recording ampère meter,

( current counter,

[blocks in formation]

Alternating or Direct Current, Two-Wire

System.

83. Outlets and Lights.

The building shall be wired to —— lamp out- 83. Outlets lets, -- switch outlets, (and -- meter outlets) for the equivalent of --, --c. P., volt lamps. The wiring shall be (to outlets only) (except for cut-outs and switches; cutouts and switches shall be furnished and installed complete). At each outlet the loose wire shall be neatly coiled and the ends carefully taped.

All wiring shall be for the parallel, two-wire 84. System. system of distribution.

in Pressure.

The fall of potential between the switch- 85. Variation board (centre of distribution) and the (farthest lamp) shall not exceed at — load - per cent. of the initial pressure; this difference to be divided as follows:

feeders 1 - per cent., mains — per cent., taps — per cent.

All wire used throughout the installation 86. Insula. shall be insulated with —

tiou.

[blocks in formation]

Each 3

Sriser,
feeder, s mal

į main, and tap shall test out with an insulation resistance of at least -- ohms. The entire installation shall test out with an insulation resistance of at least -- ohms divided by the sum of the number

in Srisers, ļ mains, and taps. Of separate i feeders, ma

88. Subdivi. 88. Subdivi. From the switchboard (or centre of distri

sion of S Risels 2

( risers, Feeders s. bution)

groups of risers, & shall be car( feeders,

(Riser)
ried to the following points: Group ( No. 1

( Feeder)
( riser
tu —-, group (No. 2 to --, etc.

( feeder
( Riser

Group No. 1 shall feed all lights (location), ( Feeder

riser
group No. 2 shall feed, etc.
( feeder)

Risers

[ocr errors]

89. Location From the switchboard (or centre of disFeeders s. tribution) the

he Srisers
feeders s

shall be carried
( under cleats, )
3 on insulators, įto ––, and thence up-
( in molding, etc., )
ward in (channels, wooden conduits, elevator
shaft, air shaft, etc., with location) to their
respective cut-out boxes.

« НазадПродовжити »