3. Bids.

4. Bond.

5. Contractor.

PREAMBLE.

Parties bidding shall state specifically just what part of these specifications their bid

covers.

A complete and correct copy of these specifications shall be attached to each bid submitted.

All bids must be submitted on or before

The right is reserved to reject any or all bids.

No bid will be considered unless accompanied by a certified check in the sum of payable to, said check to be forfeited if the successful bidder shall fail to deposit with within days after the acceptance of his bid the bond required under these specifications. The checks of unsuccessful bidders will be returned to them within days from date of opening bids.

Successful bidders will be required to furnish an approved bond within -- days after the acceptance of their bid in the sum of to faithfully commence, carry on, and complete their work in every respect according to the true spirit and intent of these specifications.

The word "contractor" as herein used refers to the party or parties whose bid or bids for the whole or any part of the work contemplated under these specifications have been accepted.

ment and

Work.

Contractors under these specifications shall 6. Commencecommence work on dates to be assigned, Completion of notice to be given of such dates not less than --days in advance. All work shall proceed as rapidly as is consistent with thoroughness and good workmanship, and shall be completed in the following times:

Installation of dynamos and apparatus within days after assigned date of commencement.

Installation of wiring and wiring devices within days after assigned date of commencement.

Erection of pole line and wire within -days after assigned date of commencement. ` Installation of fixtures and dependent work within days after assigned date of commencement.

Installation of steam plant complete within days after assigned date of commence

ment.

But delays due to strikes, riots, or accidents beyond the control of contractors shall be added to the time stipulated above for the completion of the work, provided application is made in writing by the contractor at the time such delay occurs, giving its nature and extent, such application to be subject to the approval of

If any contractor shall fail to complete his 7. Damages. work in the time stipulated above, including

time lost through unavoidable delays if such

time has been approved, there shall be deducted as liquidated damages from the contract price the sum of per day for each and every day the work remains uncompleted after the date set as above.

8. Duties of Contractors.

GENERAL SPECIFICATION.

Each contractor shall personally or through an authorized and competent representative constantly supervise the work from its beginning to its completion and acceptance.

He shall furnish all transportation, labor, apparatus, and materials necessary for performing his work according to the true spirit and intent of these specifications (and plans). He shall obtain all necessary permits and licenses for temporary obstructions, etc.

He shall at all times, until its completion and final acceptance, protect his work, apparatus and materials from accidental damage by other contractors or otherwise, making good any damage thus occurring at his own expense; also making good any injury done the building in the performance of his work. He shall be responsible for all accidents resulting through his work.

(The purchaser) agrees to afford the contractor all possible facilities to enable the work to proceed without interruption from beginning to end, and to make good any loss which the contractor suffers in consequence of delay on the part of said (purchaser).

9. Work. Labor and

All work contemplated under these specifications shall be executed in a workmanlike Materials. and substantial manner; no patched or slovenly work will be allowed.

The labor shall be thoroughly competent and skillful in its line.

Materials shall be of the highest grade unless specifically stated otherwise.

Additional work will be allowed only on the 10. Additional, written order of (the purchaser).

Specified work shall be omitted or changed only by written agreement between the contracting parties.

The addition or rebate for such added, omitted, or changed work shall be as mutually agreed upon, the amount to be stipulated in the order or agreement.

[ocr errors]

The contractor shall make good for a period of days after the final acceptance of the work all defects which develop on account of defective work or material.

Omitted or
Changed
Work.

11. Replace

ment of

Defective

Material.

Apparatus.

All patented apparatus and material must 12. Patented be furnished by the contractor under guarantee against loss through suits, royalties, or claims of any kind whatsoever, and that any loss or damage to (purchaser) through such suits or claims will be made good by said contractor.

Devices.

Every bidder is expected to include in his 13. Special proposal not only everything called for in

14. Safeguards and Débris.

15. Plans.

16. Tests.

these specifications, but also any special devices or methods peculiar to his system which will add to the safety, completeness, or efficiency of the plant, stating clearly the advantages to be derived from their use.

Contractors must provide all necessary safeguards from accidents to persons or property; must keep all passages, entrances, sidewalks, etc., free from débris and incumbrances; and on the completion of the work must remove from the premises all surplus material of every kind and description.

All plans and detailed drawings necessary to show the scope and character of the work contemplated under these specifications will be furnished by the

Figured dimensions

engineer as required. architect)

and detailed drawings

are in all cases to be followed in preference to scaled dimensions. The interpretation of all plans and drawings shall rest with the

engineer
architect

and in case any doubt arises as

to their interpretation or correctness, work shall be discontinued until such doubt is removed, or if continued it shall be at the risk of the contractor.

(Note. The character and extent of the tests, especially the final tests, must be deter