| Frank Eugene Kidder - 1892 - 1058 стор.
...the conductors arc drawn into a fixture. (f) The tendency to condensation within the pipes should bo guarded against by sealing the upper end of the fixture....inside pipe and the outside casing will be approved. (It) Each fixture must be tested for "contacts" between conductors and fixtures, for " short circuits,"... | |
| National Electric Light Association. Convention - 1892 - 458 стор.
...to condensation within the pipes must be guarded against by sealing the upper end of the fixture. 6. No combination fixture in which the conductors are...inside pipe and the outside casing will be approved. 7. Each fixture must be tested for possible " contacts " between conductors and fixture, and for "... | |
| 1894 - 622 стор.
...to condensation within the pipes must be guarded against by sealing the upper end of the fixture. 6. No combination fixture in which the conductors are...Inside pipe and the outside casing will be approved. 7. Each fixture must be tested for possible "contacte" between conductors and fixture, and for "short-circuit«... | |
| Arthur Vaughan Abbott - 1895 - 646 стор.
...to condensation within the pipes must be guarded against by sealing the upper end of the fixture. 6. No combination fixture in which the conductors are...inside pipe and the outside casing will be approved. 7. Each fixture must be tested for possible " contacts "' between conductors and fixture, and for "... | |
| Russell Robb - 1896 - 206 стор.
...abraded by the pressure of the fastenings or motion of the fixture. d. All conductors for fixture-work must have a waterproof insulation that is durable...conductors and fixtures, for "short circuits," and for groundconnections before the fixture is connected to its supplyconductors. i. Ceiling-blocks of fixtures... | |
| George H. Kimber - 1896 - 80 стор.
...abraded, and must not in any case be smaller than No. 18 B. & S., No. 2o BWG , No. 2 ESG e. All burs or fins must be removed before the conductors are...than one-fourth inch between the inside pipe and the outsike casing will be approved. h. Each fixture must be tested for " contacts " between conductors... | |
| American Institute of Electrical Engineers - 1897 - 710 стор.
...ceiling. b. Must have all burs, or fins, removed before the conductors are drawn into the fixture. c. The tendency to condensation within the pipes should...guarded against by sealing the upper end of the fixture. "if. No combination fixture in which the conductors are concealed in a space less than one-fourth inch... | |
| American Society of Mechanical Engineers - 1898 - 1122 стор.
...ceiling. t>. Must have all burs, or fins, removed before the conductors are drawn into the fixture. c. The tendency to condensation within the pipes should...guarded against by sealing the upper end of the fixture. d. No combination fixture in which the conductors are concealed in a space less than one-fourth inch... | |
| Francis Bacon Crocker - 1901 - 514 стор.
...condensation within the pipes should be guarded against by sealing the upper end of the fixture. d. No combination fixture in which the conductors are...inside pipe and the outside casing will be approved. c. Must be tested for "contacts" between conductors and fixture, for "short circuits," and for ground... | |
| Horatio Alvah Foster - 1901 - 1018 стор.
...celling. b. Must have all burs, or fins, removed before the conductois are drawn into the fixture. c. The tendency to condensation within the pipes should...guarded against by sealing the upper end of the fixture. d. No combination fixture in which the conductors are concealed in a space less than one-fourth inch... | |
| |