[blocks in formation]

Lamps

Incandescent.

Arc.

Number.

Voltage or amperage.
Candle-power.

(Plain.
Kind. -'Frosted.

(Colored, etc.

Number.

Direct current.

Alternating current.

Series working.

Parallel

Candle-power.

Single carbon.

Double

Triple

Plain or ornamental.

[blocks in formation]

Number of circuits.
Number of street lamps.
Insulation.
Poles.

Pole line 1 \ Cross arms.

Pins and insulators.
Steps.

Line lightning arresters.
Fall of potential.

f Number.

f Horizontal.
I Vertical.
Kind. -I High speed.

Medium speed.
[ Low speed.
Direct connected.
Belted.
Horse-power.

Single cylinder or compound.
Condensing or non-condensing.
Initial pressure.
Back pressure.
Speed.
Fittings.
Foundations.
Belts.

Renewal parts.
Shafting.

Pulleys and idlers.
Clutches and couplings.
Stands or hangers.
[ Foundations.

Engines?

Countershafting?

[blocks in formation]

Stack?

Piping'

Condensers?

Material.
Diameter.
Height.

Flues and dampers.
[Pier or stack foundations.

Method.

Connection with heating system.

( Ordinary gate or globe. Valves. I Keducing.

( Back pressure.
Atmospheric exhaust.
Exhaust heads.
Water supply, drips, blow off.
Pipe covering.

( Number.
i Kind.
(Capacity.

Pumps and injectors.
Heaters and purifiers.
Separators.
Oil extractors.

Date of commencement and completion

Date of starting plant.

Inspections.

Tests.

Terms of payment.

SPECIFICATION.

Parties making bids for any portion of the work contemplated under these specifications (and plans) must familiarize themselves therewith both as regards that portion of the work covered by their bid and such other work as must be carried on, or is intended to operate in conjunction therewith in order that the true spirit and intent of these specifications (and plans) maybe fulfilled. In case these specifications (and plans) are in any part deficient or not clearly expressed, the parties

making bids shall apply to for the

required information before such bids are submitted, as no changes will be allowed in specifications (or plans) after the contract is awarded except under the conditions named in article "Additional, Omitted or Changed Work."

It must be understood and agreed that these specifications (and plans) shall be fulfilled in their true spirit and intent and that any apparatus or appliance