Зображення сторінки
PDF
ePub

(Number of circuits.

Lamp. Incandescent.

amp: 1 Arc.

Switch
Number of outlets.

Meter.

Motor.

. Incandescent.
Number of lights. }
Insulation.
Insulation resistance.

Under cleats.
Method of wiring. {

J In molding.
Method 01 Wi8 1 On insulators.

(In conduits.
Variation in pressure.
Cut-outs.
Switches.
Cabinets, junction boxes, etc.

(Number.
Meters. { Kind.

( Capacity.
Converters. }

s Number.
1 Capacity.

Interior wiring ?

[blocks in formation]

Incandescent.

Lamps ?

Number,
Voltage or amperage.
Candle-power.

(Plain.
Kind. Frosted.

(Colored, etc.
Number.
Direct current.
Alternating current.
Series working.
Parallel
Candle-power.
Single carbon.
Double
Triple
| Plain or ornamental.

Arc.

Incandescent.

Fixtures ?

( Number.
Interior. Kind.

| Finish.
s Hoods.

Reflectors.

| Brackets. Exterior.

Cross-suspension

fixtures.

( Waterproof globes. s Hoods.

Plain.

Opal.
Globes. Ground.

Half-ground.

| Colored, etc. Spark arresters. Nets. Hanger boards. | Circuit cut-outs. Outriggers. Pole tops. Mast arms. Posts. | Lowering devices.

| Arc.

Number of circuits.
Number of street lamps.
Insulation.

Poles.
Pole line ? {Cross arms.

Pins and insulator3. .
Steps.
Line lightning arresters.
Fall of potential.

Number.

| Horizontal.

Vertical
Kind. High speed.

Melium speed.

(Low speed. Direct connected. Belted.

Horse-power.
Engines ?

Single cylinder or compound.
Condensing or non-condensing.
Initial pressure.
Back pressure.
Speed:
Fittings.
Foundations.
Belts.
| Renewal parts.

| Shafting. Counter

| Pulleys and idlers.

į Clutches and couplings.
shafting? 1

i Stands or hangers.
| Foundations.
Number.

Horizontal.
| Vertical.
1 Return tubular.

( Water tube. Boilers ? { Horse-power,

Fittings.
Setting.

Tools.
| Renewal parts.

Kind.

Material.

Diameter.
Stack ? Height.

| Flues and dampers.
| Pier or stack foundations.
Method.
Connection with heating system.

( Ordinary gate or globe.
Valves. Reducing.
Piping ?

Back pressure.
Atmospheric exhaust.
Exhaust heads.
Water supply, drips, blow off.
| Pipe covering.

( Number. Condensers ? Kind.

( Capacity.
Pumps and injectors.
Heaters and purifiers.
Separators.
Oil extractors.
Date of commencement and completion
Date of starting plant.
Inspections.
Tesis.
Terms of payment.

SPECIFICATION.

2. Warning.

Parties making bids for any portion of the work contemplated under these specifications (and plans) must familiarize themselves therewith both as regards that portion of the work covered by their bid and such other work as must be carried on, or is intended to operate in conjunction therewith in order that the true spirit and intent of these specifications (and plans) may be fulfilled. In case these specifications (and plans) are in any part deficient or not clearly expressed, the parties making bids shall apply to — for the required information before such bids are submitted, as no changes will be allowed in specifications (or plans) after the contract is awarded except under the conditions named in article “ Additional, Omitted or Changed Work.”

It must be understood and agreed that these specifications (and plans) shall be fulfilled in their true spirit and intent and that any apparatus or appliance

« НазадПродовжити »