Зображення сторінки
PDF
ePub

tion bolts and washers, sight feed cylinder lubricator, throttle valve, sight feed oil cups, full set of wrenches, governor pulley, driving pulley of proper dimensions for driving the dynamo selected (and all necessary pipes, valves, reducing motion and attachments for taking indicator cards.

Indicators to be furnished by the purchaser.)

(Note.—If the dynamo(s) {

are

}

to be

is

direct driven by the engine(s) there should be added to the above specification the type or types of dynamo(s) which may be selected from; the method of connecting engine(s) and dynamo(s); and any special fittings such as extension to engine foundation box, extended shaft, out board bearing, spot for supporting fields, attachment for securing brush-holder, etc.)

(As required.)

203. Painting.

204. Foundations.

The foundation(s) for the(se) engine(s)

shall be built by the contractor

purchaser of

[merged small][ocr errors][merged small]

width and depth to safely and firmly sus

their weight and all strains to

tain its

which

Y

they are

it is

}subjected. All neces

sary excavating or filling and the removal of all debris shall be done by the

{

contractor.
purchaser.

The foundations shall be

of such height that the driving pulley(s)

[blocks in formation]

(Note.-Foundations for direct-connect

ed outfits should extend under both engine and dynamo.)

(Character of the soil should also be specified, and the method of isolating and insulating the foundation if required.)

(Note. If this contractor furnishes 205. Starting

plant complete, this section can be put

Plant and Instruction.

before final summary.)

When the {engine(s)

} {

are is

} ready

they

for operation {it

shall be run for a

days by competent en

gineers furnished by the contractor.

period of

Assistant Engineer,

oil, waste, etc.,

will be furnished by (the purchaser).
This contractor shall also give all neces-
sary instructions to the engineer of (the
purchaser) for the proper care, mainte-
nance, and operation of the engine(s),

such instructions to be given during the
trial period stipulated above.

double leather, endless, solid )

206 Belts.

[blocks in formation]

207. Renewal Parts.

208. Summary.

free from defects of any kind,

in

width by in length, and capable of transmitting horse-power at a belt

speed of

Such renewal parts as it is advisable to keep on hand, adding hereto an itemized list of same.

(See Note: p. 52, sec. 27.)

Each bidder shall fill out completely the following summary:

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors]

Maximum variation in speed be

tween no load and full load

Number of pulleys

[ocr errors]
[merged small][ocr errors][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small]

adjustable, (self-oiling) boxes, base-plates,

[blocks in formation]

209. CounterShafting.

centre line of shaft

Shafting to be key-seated for the pulleys specified below, and provided with all necessary collars, guard rings, etc.

[blocks in formation]

ately bored, turned, balanced, and pro

vided with key seats and keys. Pulleys

to be

in diameter by - face, and ca

pable of transmitting

[blocks in formation]
[ocr errors]
[ocr errors]

horse-power

arm, balanced friction-clutch

210. Pulleys.

[merged small][ocr errors][merged small][merged small]
« НазадПродовжити »