Annual Reports of the War Department, Частина 2

Передня обкладинка
U.S. Government Printing Office, 1893
 

Зміст

Інші видання - Показати все

Загальні терміни та фрази

Популярні уривки

Сторінка 1169 - The re-dredging of a channel 50 feet wide and 6 feet deep at mean low water from deep water at the head of the canal to deep water below Hoxie's Landing will require the excavation of about 8,400 cubic yards of material, scow measurement. The cost is estimated at $4,200, but this ^estimate is very uncertain, owing to the unusual conditions attendmg the work.
Сторінка 1518 - Engineers, the division engineer, concurs in the opinion that this river is worthy of improvement by the General Government to the extent indicated in this report, and this opinion is also concurred in by this office.
Сторінка 1560 - ... removing snags and logs from the channel, and overhanging trees from the banks of the stream. The cost of the improvement...
Сторінка 1207 - The plan of improvement therein proposed is the dredging of a channel 100 feet wide and 10 feet deep at mean low water from the 10-foot depth in the Choptank River to the wharves at Secretary Landing, at an estimated cost of $18,600.
Сторінка 1222 - SIR: in compliance with your instructions, I have the honor to submit the following report of the...
Сторінка 1148 - SECTION 1. The Select and Common Councils of the City of Philadelphia...
Сторінка 1474 - In its original condition this stream had a low-water depth of from 3 to 4 feet from its mouth, 67 miles, to Camden. The lower 14 miles was completely blocked at all stages of water by logs, snags, etc., and at moderate stages by the bridges of the South Carolina and the Wilmington, Columbia and Augusta railroads, then without draw spans; thence to Camden navigation was possible, but dangerous, except during high water.
Сторінка 1721 - PLAN OF IMPROVEMENT. The present plan of improvement was adopted in accordance with the recommendations contained in the report of the Board of Engineers for fortifications and for river and harbor improvements, dated February 12, 1881, and printed in the Annual Report of the Chief of Engineers for 1881, page 117.
Сторінка 1633 - Island, 2f miles to the south. The harbor forms an excellent sheltered anchorage, but the shifting nature of the bar and the shallow water on its crest have presented so many difficulties to mariners that the commerce of the port has been greatly hampered. It is limited practically to the necessary supplies for St. Augustine.
Сторінка 1194 - River after the right of way is secured without cost to the United States. A project for the expenditure of this appropriation and the one of $50,000 made September 19, 1890, was submitted to the Department on January 10, 1893, and was approved. The project divides the proposed work into two sections: The first is dredging a -4-foot channel 20 feet wide in the canal and bays situated along the, line of the inland waterway between...

Бібліографічна інформація