A. E. Kennelly Alternating Current ampere-hours amperes apparatus appliances approved arc lamps Architects armature attached battery belt bidder shall fill boiler boiler insurance building capacity carried ceiling cells cent Charles Proteus Steinmetz cleats completely the following condenser conductors conduit connections contractor shall furnish covered cross-arms cuits cut-outs and switches device diameter direct currents discharging double-pole dynamo E. J. Houston engine engine(s exhaust header feed feeder fill out completely fixture schedule floor foundation foundation(s full load furnish and erect ground hereto horse-power Incandes inch installed insulating joints length less lightning arrester live steam lowering lamps material meter moisture namo necessary non-combustible Note.—Specify Note.—The specification number of lights operation outlets Ph.D placed plant porcelain proper pulleys purchaser revolutions per minute riser RULE secure shade shaft sockets soldered switchboard testing tion total number tubes valve voltage volts waterproof weather-proof rope
Популярні уривки
Сторінка 208 - ... and to employ any other person or persons to finish the work and to provide the materials therefor; and in case of such discontinuance of the employment of the Contractor he shall not be entitled to receive any further payment under this contract until the said work shall be wholly finished, at which time, if the unpaid balance of the amount to be paid under this contract shall exceed the expense incurred by the...
Сторінка 211 - If at any time there shall be evidence of any lien or claim for which, if established, the Owner of the said premises might become liable, and which is chargeable to the Contractor, the Owner shall have the right to retain out of any payment then due or thereafter to become due an amount sufficient to completely indemnify him against such lien or claim.
Сторінка 209 - Should the Contractor be obstructed or delayed in the prosecution or completion of his work by the act, neglect, delay or default of the Owner, or the Architects, or of any other contractor...
Сторінка 171 - Must be so spliced or joined as to be both mechanically and electrically secure without solder. The joints must then be soldered, to insure preservation, and covered with an insulation equal to that on the conductors.
Сторінка 181 - No combination fixture in which the conductors are concealed in a space less than one-fourth inch between the inside pipe and the outside casing will be approved. e. Must be tested for "contacts" between conductors and fixtures, for "short circuits" and for ground connections before it is connected to its supply conductors.
Сторінка 161 - VOLTS. Any circuit attached to any machine or combination of machines which develops a difference of potential, between any two wires, of over...
Сторінка 209 - ... of the Contractor, then the time herein fixed for the completion of the work shall be extended for a period equivalent to the time lost by reason of any or all of the causes aforesaid ; but no such allowance shall be made unless a claim therefor is presented in writing to the Architects within twenty-four hours of the occurrence of such delay.
Сторінка 212 - It is further mutually agreed between the parties hereto that no certificate given or payment made under this contract, except the final certificate or final payment, shall be conclusive evidence of the performance of this contract, either wholly or in part, and that no payment shall be construed to be an acceptance of defective work or improper materials.: Art.